Dee Dev Project
500 additional square feet of living space and remodeling, including: A kitchen, master bathroom, finished basement, screendoor porch, patio, a walk-in garage, mudroom, and laundry room.

2023 Winchester, MA Addition

Location
Winchester, MA
Client
residential
Project Details
Bedrooms
Baths
2-Car Garage
4,200 Square Footage

Project Gallery

Project Showcase

Project Case Study
:
2023 Winchester, MA Addition

Project Case Study

Project Case Study

Project Overview

Dee Dev is proud to present a transformative home addition and remodeling project completed in the charming town of Winchester, Massachusetts. This comprehensive renovation project involved constructing an addition off the back of the property to increase the square footage of the house, as well as fully renovating the existing interior to meet the evolving needs and preferences of the homeowners.

Key Features

  1. Expanded Living Space: The addition seamlessly connects the garage to the home, expanding the kitchen area and increasing the basement living area. This addition also incorporates a basement bedroom and full bathroom, providing additional functional space for the homeowners.
  2. Kitchen Expansion: The kitchen was not only expanded but also enhanced with ceiling windows, providing an abundance of natural light that makes the space feel larger and more welcoming.
  3. Finished Basement: A comprehensive basement renovation added a bedroom and a full bathroom, transforming it into a functional living area that can serve multiple purposes such as a guest suite or entertainment space.
  4. Laundry Room: A new, dedicated laundry room was designed to offer convenience and efficiency, equipped with modern appliances and ample storage.
  5. Mudroom: The addition of a mudroom provides a practical space for storage and transition from the outdoors, helping to keep the home clean and organized.
  6. Enhanced Master Suite: The project includes an expansion of the master bedroom and the addition of a luxurious master bathroom and closet, offering a serene retreat for relaxation and rejuvenation.
  7. Improved Bedroom Layout: Removal of the shed dormer in the rear of the property and installation of a front door dormer optimize the living space in both upstairs bedrooms, enhancing comfort and functionality.
  8. Conditioned Playroom: The existing screened-in porch was converted into a fully conditioned playroom area, providing a versatile space for family activities and entertainment year-round.
  9. Structural Enhancements: To achieve an open concept on the first floor, structural enhancements were made, including strengthening the main beam with steel channels and lally columns, allowing for the removal of a structural wall.
  10. Exterior Upgrades: The entire house received a facelift with new siding, doors, and windows, enhancing curb appeal and energy efficiency while maintaining the architectural integrity of the home.
  11. Foundation Drainage: Foundation drains were installed per plan to mitigate moisture issues and ensure the longevity of the home's foundation.
  12. Landscaping and Hardscape: The final phase of the project involved landscaping and hardscape improvements, adding the finishing touches to the exterior of the property and creating an inviting outdoor space for the homeowners to enjoy.

Project Timeline

Planning and Design

November 2022: Initial consultations and project scope definition.

December 2022: Finalization of designs and architectural plans. Submission and approval of permits.

Groundbreaking and Structural Enhancements

January 2023: Site preparation and demolition of unnecessary structures.

February 2023: Strengthening the main beam with steel channel and lally columns. Start of foundation work for the addition.

Building the Addition and Major Structural Changes

March 2023: Construction of the addition connecting the garage to the house.

April 2023: Removal of the shed dormer; installation of the front door dormer.

May 2023: Framing and exterior work, including new siding, doors, and windows.

Interior Renovations and Installations

June 2023: Major interior renovations begin, focusing on the kitchen, basement, and master bedroom expansions.

July 2023: Installation of interior finishes, bathroom fixtures, and kitchen appliances. Conversion of the screened porch into a conditioned playroom.

Final Touches and Quality Assurance

August 2023: Final installations, including plumbing, electrical, and HVAC systems. Start of landscaping and hardscaping.

Late August 2023: Final inspections, quality assurance checks, and addressing any punch list items.

Project Completion

September 1, 2023: Official completion of the project. Final walkthrough with the client and handover of the renovated property.

Project Insights

Objectives

  • Increase the square footage of the house through an addition connecting the garage to the home.
  • Expand and modernize the kitchen and basement areas.
  • Enhance the master bedroom with an added master bathroom and closet.
  • Convert the existing screened porch into a fully conditioned playroom.
  • Improve structural integrity and open up the living spaces.
  • Upgrade the exterior with new siding, doors, and windows.
  • Complete the renovation with professional landscaping and hardscaping.

Challenges

One of the main challenges was reinforcing the structural integrity of the existing building to support the additional space. This involved installing a new steel channel and lally columns to replace a structural wall with an open concept design on the first floor. Another challenge was integrating the new sections of the building with the existing architecture to create a seamless expansion.

Solutions

  • Constructed a rear addition to connect the garage to the main house, expanding critical areas such as the kitchen and basement.
  • Removed a shed dormer and installed a front door dormer to increase the upstairs living space.
  • Installed foundation drains as per the architectural plan to ensure proper drainage around the new construction.
  • Utilized high-quality materials for new siding, doors, and windows to enhance durability and aesthetic appeal.
  • Employed skilled tradespeople to ensure high standards of craftsmanship throughout the project, particularly in the creation of the new master suite and playroom.

Results

The project successfully increased the functional living space of the home while enhancing its aesthetic and structural integrity. The new open concept on the first floor, along with the expanded and upgraded kitchen, master bedroom, and basement, have significantly improved the overall flow and usability of the home. The exterior upgrades and landscaping have also elevated the property's curb appeal.

Conclusion

This project not only met but exceeded the homeowner’s expectations, delivering a beautifully renovated space tailored to their needs. The strategic enhancements have made the home more enjoyable and functional for daily living, demonstrating Dee Dev's commitment to quality and client satisfaction.

© 2024 Dee Development, LLC | All Rights Reserved
Created by aceM